Governance · Collective Asks · Question Bank

Getting organised before handover.

Two things live here. The collective asks — the handful of things that can only be settled while the towers are still being built, which we want Prestige to clarify or commit now. And the running question bank for life after we move in, so good questions from the group aren't lost to the scroll.

Collective asks · before handover

What we're asking Prestige to lock down now.

Gates, metering, EV points, cabling — some things can only be set while the towers are still under construction. Once we take handover, they're effectively fixed. With 500+ owners here, a single united, documented ask carries far more weight than a message lost to the scroll. These are the items the group has raised most often. They're owner concerns, not confirmed facts — each is something we want Prestige to clarify or commit in writing before handover.

🚶
A walkable entry to the mall from the society

A direct pedestrian connection between the society and the mall — so a quick trip doesn't mean driving out one gate and back in through another. A dedicated walkway or pedestrian gate is far easier to plan into the layout now than to add after handover.

Clarity pending ⚠ Fixed at construction stage
🔌
EV charging & electrical provisioning

Conduits and points for EV charging in the parking — and the wiring for smart / prepaid meters — are far cheaper to lay during construction. Retrofitting the parking and shafts later is disruptive, expensive, and often needs association-wide approval.

Clarity pending ⚠ Fixed at construction stage
🎥
CCTV & security infrastructure

Community-wide camera coverage and cabling is much cheaper to build in now than to retrofit. Owners want to know whether Prestige provides it, or whether it becomes a large post-handover cost on the association.

Clarity pending
🔋
DG power backup — scope & cost

The brochure mentions 100% DG backup at extra cost. Owners want the exact scope, and the per-flat cost, confirmed in writing before handover rather than discovered on the first bill.

In brochure · confirmation pending
🌳
Keep the green, pedestrian-first spaces green

Many of us chose TPCH for the green podium in the renders and scale model. The RERA-approved plan can't be structurally redrawn — so the ask is two-fold: written clarity on what greenery and vehicle-free zones are actually committed, and the non-structural touches (planting, bollards, signage) that protect the pedestrian feel.

Clarity pending Design is RERA-locked — seek clarity, not redesign
Association & rules

Association & rules

What is the Good Living document / Deed of Declaration, and which rules does Prestige pre-set before the owners' association is formed?
Open
How are move-in / move-out charges decided, and do they apply to owners moving internally between towers or floors?
Open
Once the association forms, which decisions need a formal vote vs individual choice?
Open
Will the society / association help owners collect rent or evict problem tenants, or are owners on their own?
Open
Life events

Life events

How is an unfortunate demise or bereavement in a family handled in a community like ours, with minimum inconvenience to the family and the society?
Open
Construction & handover

Construction & handover

What stage has each tower reached, and the expected possession date? — See the Construction page.
Answered
Where are my tower's official documents? — See the Document Library.
Answered
Anything about home loans and disbursal? — See the Home Loan FAQ.
Answered
Neighbourhood & development

Neighbourhood & development

What do the 111 GO zone and ORR development recommendations mean for our area's future?
Open

Have a question that isn't here?

Add it to the bank and we'll fill in the answer as the community learns it.

Submit a question →